Customization: | Available |
---|---|
After-sales Service: | Whole Life After Sale Service |
Warranty: | Whole Life After Sale Service |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
C Stud Steel Roll Forming Machine
Main workflow of C Stud Light Steel Making Machine:
Uncoiler ----- Molding core ----- Hydraulic System ----- Automatic Control system ----- Step Formed Mechanism
-----Automatic Shearing Mechanism ----- Products Receiving Tables
Roll Forming Machine Components:
No. |
Name |
Qty |
1 |
De-coiler |
1 Set |
2 |
Forming Machine |
1 Set |
3 |
Hydraulic Cutting Device |
1 Set |
4 |
PLC Control Box |
1 Set |
5 |
Hydraulic Pump Station |
1 Set |
6 | Production Support Table | 1 Set |
7 | Pre-sliding Cutter | 1 Set |
Ceiling Steel Channel Making Machine Metal Drywall Profile C Stud Cold Roll Forming Machine | |
Material thickness |
0.3-0.8mm |
Diameter of shaft(solid shaft) |
70mm |
Material of shaft (solid shaft) |
(high grade) 45# Steel, quenching and tempering treatment |
Material of roller |
45# steel polished and coated with chrome HRC55-60° |
Reducer |
8# cycloid reducer (high grade) |
Cutting |
hydraulic cutting after roll forming |
Control system |
PLC Frequency Control System with touch screen |
IBR Type Roll Forming Sheet :
STEELMAMA Co., Ltd.
STEELMAMA was founded in 2009. Since its inception, STEELMAMA has always uphold the "create a first-class enterprise, first-class talents, first class contribution" vision, to create a well-known "STEELMAMA" brand.
STEELMAMA's main business is to "project" as the theme of "CHINA STEEL AGENT SERVICE", leading products for steel profile machinery include roll forming machine, press brake bending machine and other steel processing machinery, and steel coil include PPGI coil, GI coil, Aluminium coil, Alu-zinc coil and steel strips and plates, also steel building material like metal roofing sheet, purlin sections, H steel, welding mill tube and some hardwares to be global brand.
Installation and Training:
1.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
2.Without visiting, we will send you user manual and video to teach you to install and operate.
3.If buyer needs our technician to go to your local factory,please arrange round trip tickets, food and hotel and everyday salary , visa cost and necessary things.
1. Does one machine can only produce one style panel profile?
Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of panels.
2. Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.
3. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
4. What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts freell,but you need pay the express cost yourself.if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.
5. Can you be responsible for transport?
Yes,please tell me the destination port or address.we have rich experience in transport.
6. You are trade company or factory?
We are trade company but we also have own factories. Building trade company is just for exporting various types of cold roll forming machines.
7. Why your price is higher than others?
As we persist on that each factory should put quality at the first place. We spend time and money on developing How to make machines much more automatic, accurate and high quality. We can make sure thatour machine could use more than 20 years without any problem. We can provide 2 years free qualityassurance.
8. How long the machine could be made?
Normally speaking, welded pipe making machine could be made without 45 working days. If you need machines in a hurry, we can make it for you less than a month.